Projects

Projects we stand proud

Our team has completed over 450 projects in Russia and CIS and continues to work for major Clients in industry.

Our projects

Our Clients value us for our comprehensive approach to solving engineering and technological issues and challenges, and ability to find and develop optimal safe, innovative and sustainable solutions.

Map List
Filter
Hydrometallurgy
Processing
Miscellaneous
Reset

Source: Yandex maps, all content belongs to Yandex LLC

Polar Lithium
Data
Direction
Hydrometallurgy
Client
Polyraniy Litii LLC
Location
Murmansk region, Russia
Commodity
Lithium
Duration
2024
Description

Scoping Study to determine location of chemical and metallurgical plant for spodumene concentrate processing with CAPEX and OPEX assessment within the Kolmozerskoye Lithium deposit development project

Gross Mine Gold Mill Northern Heap Leach Pad
Data
Direction
Hydrometallurgy
Client
Neryungri-Metallic LLC
Location
Republic of Sakha (Yakutia), Russia
Commodity
Gold
Duration
2024
Description

Construction of  230 Mt static Heap Leach Pad, Sorption workshop with Reagent Preparation Unit, pumping unit for process solutions, boiler house for heating solutions and other infrastructure facilities. Trade-off studies and design documentation, assisting during State Expert reviews

Stoilenskiy GOK Brownfield Project
Data
Direction
Processing
Client
Stoilenskiy GOK JSC
Location
Belgorod region, Russia
Commodity
Iron Ore
Duration
2023-2024
Description

Design solutions to increase capacity of Crushing & Screening at open-pit mine area of Concentrator, Stoilenskiy Mine. Detailed design to replace the slurry pump at Beneficiation Unit of Stoilenskiy Mine within equipment upgrade program. Development of the Main Engineering Solutions to replace vacuum filters at Filtration of Beneficiation Unit, Stoilenskiy Mine within equipment upgrade program

Kovdorskiy Mine Apatite-Staffelite Ores Complex Improvements
Data
Direction
Processing
Client
Kovdorskiy GOK JSC
Location
Murmansk region, Russia
Commodity
Apatite-staffelite ores, apatite-carbonatite ores
Duration
2024
Description

Preliminary design to improve capacity of apatite-staffelite ores complex with further transition of apatite-staffelite process circuit to apatite-carbonatite processing including dry X-ray radiometric separation

Bystrinskoye Mine
Data
Direction
Processing
Client
GRK Bystrinskoye LLC
Location
Trans-Baikal Territory, Russia
Commodity
Gold
Duration
2024
Description

Project Design and Detailed Design, expert review of cocentrator re-equipment project and Gold Mill construction with capacity of 2.7 Mt/y

Confidential Client
Data
Direction
Processing
Client
Confidential
Location
Sakha Republic (Yakutia), Russia
Commodity
Gold
Duration
2024
Description

Main Engineering Solutions for mine construction, economic performance of options considered in MES including open-pit mine, processing plant, tailings facilities and infrastructure

NORDGOLD Suzdal Project
Data
Direction
Miscellaneous
Client
Financial and Investment Corporation "Alel" JSC
Location
East Kazakhstan Oblast, Kazakhstan
Commodity
Gold
Duration
2024
Description

Conceptual design for tailings management of Suzdal Mine

RLE Project
Data
Direction
Hydrometallurgy
Client
Kola MMC JSC
Location
Monchegorsk
Commodity
Copper
Duration
ongoing
Description

Feasibility study for equipment supply for processing of copper concentrate produced in converter matter separation including technology assessment and CAPEX estimate, electrowinning inclusive.

  • Main Engineering Solutions and Basic Engineering
  • Design and Detailed Design Documentation
  • Testing support
Expansion Project of Kovdorskiy GOK
Data
Direction
Processing
Client
Kovdorskiy GOK JSC
Location
Kovdor
Commodity
Iron ore
Duration
2021-2022
Description

Engineering Consultancy, Process Design, Optimization and Debottlenecking, Full Circuit Sampling, Process Modelling

Nickel Production Diversification
Data
Direction
Hydrometallurgy
Client
Kola MMC JSC
Location
Monchegorsk
Commodity
Nickel
Duration
2021 -2023
Description

Pre-Feasibility and Process Design. Renovation of existing operations for production of galvanized nickel cathode and nickel-base superalloys

Udinsk Gold Pre-Feasibility & Feasibility Study
Data
Direction
Hydrometallurgy
Client
Udinsk Gold LLC (Kinross)
Location
Khabarovsk krai, Russia
Commodity
Gold
Duration
2020-2022
Description

International Standards based Pre-Feasibility Study (2020-2021)

Start of International Standards based Feasibility Study (2021-2022)

Engineering solutions for process facilities (Crushing units, Material Handling, Heap Leaching pads, Gold Mill), plantwide and infrastructure facilities (Administrative Amenities and Camp, warehouse and repair shops, jetty and airport/air strip, power generation equipment)

Amursk POX Hub Expansion
Data
Direction
Hydrometallurgy
Client
Amursk Hydrometallurgy Complex LLC
Location
Khabarovsk krai, Russia
Commodity
Gold
Duration
2019-2022
Description

Supply of customized world’s largest Pressure Oxidation Plant: D - 5.95 m, L – 50 m, V operating – 1 100 cubic m, weight ~ 965 t

Design and supply support for equipment, utilities, off-gas treatment system, heat recovery and slurry conditioning.

Basic Engineering, Detailed Design, Procurement, Quality Management, Project Management, Planning & Project Controls

Project documentation. Ak-Sug Mining and Processing Plant Construction
Data
Direction
Processing
Client
Intergeo LLC / Giprotsvetmet JSC
Location
Republic of Tyva, Russia
Commodity
Copper
Duration
2018-2020
Description

Trade-off studies and technology selection, tailings disposal, final product market analysis, and process testing, design documentation and obtaining construction permits within two stages of project

Ozerny Process Flowsheet Development
Data
Direction
Processing
Client
Ozernoye LLC
Location
Republic of Buryatia, Russia
Commodity
Lead, zinc
Duration
2018-2019
Description

Audit of design documentation and engineering solutions

Process Flowsheet development

KHF Hydrometallurgical Facility PFS
Data
Direction
Hydrometallurgy
Client
KGMK LLC / TriArk Mining LLC
Location
Krasnokamensk, Zabaykalsky krai, Russia
Commodity
Rare earth metals
Duration
2018-2021
Description

Expedited Feasibility Study for Hydrometallurgical Plant including process design, all discipline design, 3D modelling, specifications, P&IDs and other, and receiving firm quotes, logistics studies, CAPEX and OPEX estimates (AACE 3d class), third level project implementation plan.

Previous stage included Pre-Feasibility Study and development of innovative processing technology, including SX, precipitation and pyrohydrolysis

Industrial Sulphur Transfer Complex. Indoor Storage #4. Rail Car Unloading Station with Conveyor Galleries
Data
Direction
Miscellaneous
Площадка
European Sulphur Terminal LLC
Location
Ust-Luga port, Russia
Duration
2020
Description

Process Design Section of design documentation for a complex of new facilities of Sulphur Terminal in Ust-Luga port, including:

  • Sulphur Storage, 50,000 cubic m capacity
  • Rail Car Unloading Station with Car Dumper
  • New conveyor lines with transfer units tied-in to existing Terminal’s facilities.

Approved by LenOblGosExpertiza State Expert Review. Construction completed and commissioned

Construction of new HBI/DRI plant
Data
Direction
Hydrometallurgy
Client
Mikhailovsky GOK JSC/Metalloinvest
Location
Belgorod region, Kursk region, Russia
Commodity
Iron ore
Duration
2019
Description

Study of new shop location options by considering availability of footprint area, feed supply, power supply and infrastructure facilities. Selection of equipment composition and capacity, both main and auxiliary process equipment.

Resources assessment for project implementation. Economic assessment and justification of the most efficient technology option. Identification and evaluation of strategic, economic, environmental, social and other benefits for all project stakeholders.

Potential for future HBI production expansion and EAF complex construction with DRI charged in hot condition.

Gross Deposit Development FEL3
Data
Direction
Hydrometallurgy
Client
Neryungri-Metallik LLC
Location
Republic of Sakha (Yakutia), Russia
Commodity
Gold
Duration
2013-2015
Description

Design Documentation for all basic facilities of Mining & Processing Complex: open-pit mine, handling facility, heap leaching stockpile, Gold Mill, intrasite infrastructure facilities. Approved by State Expert Review Board of Russia

Klen. Klen PFS. Technological solutions
Data
Direction
Hydrometallurgy
Client
Russdragmet LLC
Location
Chukotka, Russia
Commodity
Gold
Duration
2016-2018
Description

Project Optimization developed by a third party.

Optimization of engineering solutions for mine, plant and surface infrastructure. OPEX and CAPEX estimate, Financial Model

Kekura Deposit Scoping Study
Data
Direction
Processing
Client
Bazovye Metally JSC
Location
Chukotka, Russia
Commodity
Gold
Duration
2014
Description

Project included three options of mine development (open-pit, underground and combined), plant and infrastructure facilities design.

Assessment and front end loading of mine, plant and tailings infrastructure facilities, evaluation of logistics from mine to port, coordination with local port administration

Shalkiya Zinc
Data
Direction
Processing
Client
Tau-Ken Samruk - ShalkiyaZinc Ltd JSC
Location
Kyzylordinskaya region, Republic of Kazakhstan
Commodity
Lead, zinc
Duration
2015-2017
Description

Bankable Feasibility Study.

Support during EPC contracting for Shalkiya Mine and Concentrator construction.

Technical and economic evaluation of potential contractors' proposals.

Audit of manufacturers as engineering support of Client’s team

Aktogay Copper Smelter
Data
Direction
Miscellaneous
Client
Aktogay Smelter LLC
Location
Ayagoz district, East Kazakhstan region, Republic of Kazakhstan
Commodity
Copper
Duration
2017-2018
Description

Copper processing technology including smelting, converting, crude copper production, electrorefining, precious metal extraction, sulphuric acid production.

Layout design for the entire industrial complex, EIA analysis and measures.

CAPEX and OPEX estimate. Project cost-benefit analysis

KAS#2 Kazakhstan Plant Expansion
Data
Direction
Miscellaneous
Client
Kazakhstan Aluminium Smelter JSC
Location
Pavlodar, Republic of Kazakhstan
Commodity
Aluminium
Description

Pre-Feasibility Study including evaluation of technologies from different suppliers, preparation of bid packages, development of Plot Plan of the Plant, costs estimate, recommendations to suppliers on EPC contracting for project implementation.

Project Management services at the stage of two FS development based on Kazakhstan standards and bank requirements

Olympiada Mine to Mill Project. Continuous Support
Data
Direction
Processing
Client
Polyus Krasnoyarsk JSC
Location
Krasnoyarsk krai, Russia
Commodity
Gold
Duration
2018-2022
Description

Mine to Mill Project implementation

Verninskiy Mine to Mill Support
Data
Direction
Processing
Client
Polyus Verninskoye JSC
Location
Irkutsk region, Russia
Commodity
Gold
Duration
2017-2018
Description

Mine to Mill Project implementation

Blagodatnoye Mine to Mill Project. Integration & Optimisation. Continuous Support
Data
Direction
Processing
Client
Polyus Krasnoyarsk JSC
Location
Krasnoyarsk krai, Russia
Commodity
Gold
Duration
2016-2021
Description

Mine to Mill Project implementation

Blagodatnoye Heap Leach Scoping Study
Data
Direction
Hydrometallurgy
Client
Polyus Krasnoyarsk JSC
Location
Krasnoyarsk krai, Russia
Commodity
Gold
Duration
2015
Services
Heap Leaching Project
Description
Natalka Mine Mine to Mill Project
Data
Direction
Processing
Client
Polyus Magadan JSC
Location
Magadan region, Russia
Commodity
Gold
Duration
2018-2019, 2021
Description

Mine to Mill Project Integration & Optimisation

Natalka Optimization Study
Data
Direction
Processing
Client
Polyus Magadan JSC
Location
Magadan region, Russia
Commodity
Gold
Duration
2015-2016
Description

Process testing to develop process flow diagram that ensures maximum gold recovery

Optimization of layout design

Optimization of CAPEX and OPEX, Bankable Feasibility Study

ERG / SSGPO Asset Integrity and Limits
Data
Direction
Processing
Client
SSGPO JSC
Location
Kostanay region, Kazakhstan
Commodity
Iron ore
Duration
2018-2020
Description

Asset Integrity and Limits Assessment of existing SSGPO JSC plant facilities within two stages: ААСЕ Class 5 (Conceptual Study) and Pre-Feasibility Study level

Zabaikalsky GOK. Pre-Feasibility Study for lithium extraction from waste dumps
Data
Direction
Miscellaneous
Client
Atomredmetzoloto JSC
Location
Zabaikalsky krai, Russia
Commodity
Lithium
Duration
2017-2018
Services
Pre-Feasibility Study
Description